General case data

Field Meaning
ID Unique ID for the connection case
Imported Whether the case was imported from another system
Project title Name of the project
Project description Additional description of the project
Company name Customer company
Company org. number Organization number of the customer
Current phase Overall phase of the case (e.g. Reserved, Archived etc)
Case states Detailed internal states the case is in derived from state machine diagram
Created on When the case was created
Last updated When the case was last updated

Customers

Field Meaning
Customer contacts List of people associated with the case. Roles: customer contact, customer signer and customer. Also added to in the application

Power requirements

Field Meaning
Direction Production or consumption
Industry / category Type of production or consumption (e.g. Solar, Wind, Hydrogren, Landstrøm)
Project type Technical classification (e.g. SolarPower)
Peak power (MW) Maximum required or produced power
Estimated annual energy (GWh) Expected yearly energy
Increase of existing connection Whether this is an increase of an existing connection

Requested time for connection (tilknytningstidspunkt)

Field Meaning
Requested year Desired year for connection
Requested quarter Desired quarter for connection

Location

Field Meaning
Search type How the location was identified (address, coordinates, gnr/bnr)
Municipality Municipality name and number
Address Street address
Postal code Postal code
Postal town City
Gnr / Bnr Gårds nr. bruks nr.
Coordinates Latitude and longitude of the connection point

Assessment (veiledende vurdering)

Assessment (Veildende vurdering) LGO

Field Meaning
Grid company Name and org. number
Case handler Responsible person
Connected to upstream grid Whether bypass to higher grid exists
Availability Capacity availability status: available, available in planned, unavailable, imported, bypassed
Estimated cost (MNOK) Rough cost estimate
Estimated year Earliest possible year
Assessment description Explanation of the assessment

Assessment (Veieldende vurdering) RGO

Field Meaning
Substation Connected substation for grid level
Voltage level (kV) Voltage level
Grid company Responsible company
Availability Capacity availability status: : available, available in planned, unavailable, imported, bypassed
Estimated cost (MNOK) Rough cost estimate
Estimated year Earliest possible year
Assessment description Explanation
Connected to upstream grid Whether bypass to higher grid exists - only possible to select if LGO has selected this option

Assessment (Veieledende vurdering) TGO

Field Meaning
Substation Connected substation for grid level
Grid company Transmission grid owner
GCR ID Reference to existing case (if imported)
Availability Capacity availability status: available, available in planned, unavailable, imported, bypassed
Estimated cost (MNOK) Rough cost estimate
Estimated year Earliest possible year
Connected to upstream grid Whether bypass to higher grid exists - only possible to select if RGO has selected this option

Customer assessment (veiledende vurdering) and acceptance:

Field Meaning
Assessment sent on Date assessment was sent to customer
Assessment deadline Deadline for acceptance by customer
Accepted on Date customer accepted
Final estimated cost (MNOK) Combined estimate
Final estimated year Combined timeline
Availability Overall availability result

Application (søknad)

Application dates:

Field Meaning
Application submitted Date of submission
Application updated Last update
Application approved Approval date
Maturity date Used for queue prioritization // based on application submitted date

Finance plan:

| --- | --- |

Power Requirements: