| Field | Meaning |
|---|---|
| ID | Unique ID for the connection case |
| Imported | Whether the case was imported from another system |
| Project title | Name of the project |
| Project description | Additional description of the project |
| Company name | Customer company |
| Company org. number | Organization number of the customer |
| Current phase | Overall phase of the case (e.g. Reserved, Archived etc) |
| Case states | Detailed internal states the case is in derived from state machine diagram |
| Created on | When the case was created |
| Last updated | When the case was last updated |
| Field | Meaning |
|---|---|
| Customer contacts | List of people associated with the case. Roles: customer contact, customer signer and customer. Also added to in the application |
| Field | Meaning |
|---|---|
| Direction | Production or consumption |
| Industry / category | Type of production or consumption (e.g. Solar, Wind, Hydrogren, Landstrøm) |
| Project type | Technical classification (e.g. SolarPower) |
| Peak power (MW) | Maximum required or produced power |
| Estimated annual energy (GWh) | Expected yearly energy |
| Increase of existing connection | Whether this is an increase of an existing connection |
| Field | Meaning |
|---|---|
| Requested year | Desired year for connection |
| Requested quarter | Desired quarter for connection |
| Field | Meaning |
|---|---|
| Search type | How the location was identified (address, coordinates, gnr/bnr) |
| Municipality | Municipality name and number |
| Address | Street address |
| Postal code | Postal code |
| Postal town | City |
| Gnr / Bnr | Gårds nr. bruks nr. |
| Coordinates | Latitude and longitude of the connection point |
| Field | Meaning |
|---|---|
| Grid company | Name and org. number |
| Case handler | Responsible person |
| Connected to upstream grid | Whether bypass to higher grid exists |
| Availability | Capacity availability status: available, available in planned, unavailable, imported, bypassed |
| Estimated cost (MNOK) | Rough cost estimate |
| Estimated year | Earliest possible year |
| Assessment description | Explanation of the assessment |
| Field | Meaning | |
|---|---|---|
| Substation | Connected substation for grid level | |
| Voltage level (kV) | Voltage level | |
| Grid company | Responsible company | |
| Availability | Capacity availability status: : available, available in planned, unavailable, imported, bypassed | |
| Estimated cost (MNOK) | Rough cost estimate | |
| Estimated year | Earliest possible year | |
| Assessment description | Explanation | |
| Connected to upstream grid | Whether bypass to higher grid exists - only possible to select if LGO has selected this option |
| Field | Meaning |
|---|---|
| Substation | Connected substation for grid level |
| Grid company | Transmission grid owner |
| GCR ID | Reference to existing case (if imported) |
| Availability | Capacity availability status: available, available in planned, unavailable, imported, bypassed |
| Estimated cost (MNOK) | Rough cost estimate |
| Estimated year | Earliest possible year |
| Connected to upstream grid | Whether bypass to higher grid exists - only possible to select if RGO has selected this option |
| Field | Meaning |
|---|---|
| Assessment sent on | Date assessment was sent to customer |
| Assessment deadline | Deadline for acceptance by customer |
| Accepted on | Date customer accepted |
| Final estimated cost (MNOK) | Combined estimate |
| Final estimated year | Combined timeline |
| Availability | Overall availability result |
| Field | Meaning |
|---|---|
| Application submitted | Date of submission |
| Application updated | Last update |
| Application approved | Approval date |
| Maturity date | Used for queue prioritization // based on application submitted date |
| --- | --- |